Page Content
Kitchen Renovations
Bear Creek Elementary (BCE) | Hutsell Elementaty (HE) |
Estimated Project Timeline
Compliance Details
javascript:commonShowModalDialog('{SiteUrl}'+
'/_layouts/15/itemexpiration.aspx'
+'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+
'/_layouts/15/hold.aspx'
+'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+
'/_layouts/15/Reporting.aspx'
+'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+
'/_layouts/15/expirationconfig.aspx'
+'?ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=23
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+
'/_layouts/15/DocSetVersions.aspx'
+ '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=23
javascript:GoToPage('{SiteUrl}' +
'/_layouts/15/docsetsend.aspx'
+ '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350
Scope of Work
BCE
The kitchen at Bear Creek Elementary has not had a major upgrade since the school was built in 1978. A majority of the kitchen equipment is original to the school. Only drainage concerns were addressed in the 2006 Bond.
Scope of work includes:
An additional serving line and reconfigure existing so that there is better flow and layout. Campuses with an enrollment over 500 have two serving lines available.
Additional steamer needed.
Larger freezer/cooler.
New dish machine.
New steam table.
Pass through warmer.
Restroom renovation to include provisions for Americans with Disabilities Act (ADA).
Flooring and lighting.
HE
The kitchen at Hutsell Elementary has not had a major upgrade since the school was built in 1978. A majority of the kitchen equipment is original to the school. Only drainage concerns were addressed in the 2002 Bond.
Scope of work includes:
Area between serving line and wall not wide enough to safely maneuver a wheelchair to be in compliance with the Americans with Disabilities Act (ADA).
Larger cooler and freezer to accommodate enrollment.
Restroom renovation to include provisions for Americans with Disabilities Act (ADA).
Address flooring, walls, electrical, and lighting (interior & exterior).
New dish machine.
Provide for digital clock on serving lines and in the kitchen to be synchronized with campus.
Additional steamer.
Two (2) additional reach in coolers.
TEA Met Standard - District & Campuses