|
Bonds
| Demographics
|
Portables |
Transportation
Safety & Security |
Construction
| Curriculum & Instruction |
Technology
Bonds
What
are bonds? How long does it take to pay them off?
Bonds for school
projects are very similar to a mortgage on a home. To finance construction
projects, the district sells bonds to investors who will be paid principal and
interest. Payout is limited by law to 40 years. Current projections show these
bonds to be paid off in 30 years.
If
these bonds are approved, is the district obligated to spend the money?
No. Voter
approval is an authorization for the district to issue bonds. They will be sold
in the future when funds are needed.
Demographics
Are there
any schools currently under-enrolled? Which ones?
Although the district does have campuses that are
below capacity, that does not mean there is room available for additional
students. One of the major factors that influences capacity is the configuration
of rooms for special programs at that campus. For example, a regular classroom
might be used for a special education, compensatory class, or other program that
has a very low student/teacher ratio. In that case, a room would accommodate 22
students might only have four to eight instead.
Katy ISD has several elementary schools whose enrollments are below the stated
capacity. All of the junior high schools are below capacity except McDonald,
Mayde Creek and Katy Junior High, and all of the high schools are below capacity
except Cinco Ranch and Morton Ranch.
Do the demographers predict any schools
becoming under-enrolled, which ones, and when? How would such a condition play
into redoing attendance areas and impact transportation?
We do see some campuses drop below capacity when new
campuses are added using students from their attendance zone. Rezoning
committees look closely at enrollment projections for future years (not just the
year a new school opens), and are very attentive to balancing enrollments and
stabilizing attendance areas for all affected Land Use Zones as soon as possible
after a new school opens. As a result, enrollment numbers tend to stabilize
close to the capacity number.

Portables
How many
students in Katy ISD attend classes in portables?
Approximately 11,800 students out of 50,570 attend
a class in a portable building for some part of a school day. At
elementary schools, portables often serve an entire grade level or levels, so
students may spend a majority of the day in a portable. The district has 101
portables at elementary schools, serving approximately 3,030 students.
At secondary schools where students change classes each period,
principals make every effort to build their master schedules so that students
have one or two classes in a portable, but spend the remainder of the day in the
main building. That means that, although each individual student spends fewer
hours each day in temporary classrooms, more students have at least one class
located in a portable. A few junior highs “cluster” grade levels in portables,
but more often, students rotate into the building with class changes. This year,
with 41 portables at junior high campuses and 18 at high school campuses,
approximately 8,850 students spend some time each day in a portable.
At any one point in time during the school day, however,
approximately 4,800 students are attending a class in a portable: 3,030
elementary students and about 1,770 secondary students.
While it is true that nearly one in four students attends class
in a portable at some time during the school day, less than one in ten
(9.5%) are in portables at any one time.
Isn’t the use of portables a sign of poor
planning?
Judicious use of temporary
buildings is part of Katy ISD’s overall facility plan and will continue to be as
long as the district is growing rapidly. Placing temporary buildings on an
interim basis allows the district to assess growth carefully before constructing
new campuses and to open new buildings with enrollments that are large enough to
make them cost-effective to operate.
How was the
district able to reduce portable cost by $10,000 per unit in less than a year while
construction costs have gone up? What was left off the new building bids?
The original cost for portable building was $80,000.
The new number is $75,000. The $5,000 reduction in the estimate is a combination
of a new vendor and reviewing the cost of recently installed portables.
What is the
square footage of a portable classroom?
A portable classroom is 768 square feet. There are two
classrooms per building.
Why do we
have portables in built-out areas?
Even when an area of the district is built-out,
special programs can force the need for portables buildings. When the area has
stabilized long term, we would like to replace the portables with a permanent
building. An example of this would be Nottingham Country Elementary and Hutsell
Elementary.
In the secondary levels, the attendance zones are so big that there is always
the possibility of growth. An example is Beck Junior High. They are currently
below capacity but have five portable buildings because of special programs. The
area looks built-out, however there are two apartment complexes being built in
the attendance zone.

Transportation
What is
meant by resale on retired busses and what is the economic life of a bus? When does
it make economic sense to replace a bus?
When the District retires a bus from service it is
sold at a public auction and generally brings a minimal amount, around
$500-$2000.
As with an individual’s personal vehicle, there is no standard economic life
of a bus; it depends on many factors including miles driven, body deterioration
and service needs. However, we have many buses on daily runs that are more than
15 years old and our reserve fleet is generally comprised of buses older than
this.
Our present practice is to operate a bus until it costs more to repair it than
it is worth at a public auction. The industry and government both recommend sale
after 10 to 15 years. The oldest buses we own are 25 years old. We use them
in-district and minimize driving them. Reliability is always a significant
concern with our older buses as parts become more difficult to find as repair
is required. In addition, fuel economy on our older buses is poorer and they
contribute more to air pollution. We believe we should move toward a 16-year
life cycle which surpasses industry recommendations, yet minimizes the risks of
operating much older buses.
Why new buses?
New buses would accommodate the portion of the
student growth that will ride buses to or from school and to replace many of the
aged buses in our fleet as part of a comprehensive, multi-year replacement
cycle. New buses would be for both our regular ed program as well as our special
ed program. As those vehicles age, there are
questions of reliability, parts availability, fuel economy, pollution and so
forth.
Why is the
transit bus cost of $78,974 proportionately more than a conventional bus of
$60,063?
The actual cost per seat is $846 for the conventional
and $940 for the transit. The larger bus requires heavier axles, brake systems
and more material to build. The transit is built as a bus. The conventional bus
is built on a truck chassis. Due to the large quantity of truck chassis
constructed, economy of scale brings the price down.
Although the up front price is more for
the transit bus, what is the benefit?
The long-term cost of operation of a transit bus
versus a conventional bus is the key. Those areas in KISD that are denser in
population favor the use of transit buses as indicated below.
Six transit buses have the capacity to carry as many
passengers as seven conventional buses can carry:
The cost of wages and insurance for one
driver (the difference in the use of six vs. seven buses to transport the same
number of students) is approximately $13,000 per year or for the life of the
bus, which, over 16 years, is $208,000. This savings is for each driver not
hired.

Safety & Security
Provide a typical footprint of cameras
for each type of campus.
-
Elementary
2 DVR’s
32 Cameras (19 indoor, 13 outdoor)
-
Junior High
3 DVR’s
48 Cameras (33 indoor, 15 outdoor)
-
High School
4-5 DVR’s
64-80 Cameras (68 indoor, 12 outdoor)
-
9th Grade Center
1 DVR
16 Cameras (13 indoor, 3 outdoor)
Who will
monitor the cameras? Will additional staff be needed?
No additional staff will be needed. The cameras can be
monitored at various desktops in the reception area or campus administrators’
offices.
Does the
criminologist review camera layout with campus staff on placement?
Yes, the principal and a police representative will
also review the layout and may have cameras relocated or repositioned before
installation.
Can we get
the camera cost broken down by group?
The elementary standard is $148,400.00; junior high
standard is $174,900.00; and the senior high standard is $424,000.00.
Where will the cameras be located at the
campuses?
Cameras are placed in common areas such as hallways,
lunchrooms, library, gymnasiums, and exterior doors, but not in regular
classrooms.
In regards to the visitor registration &
tracking system, what provisions would be made for those without IDs and driver
license numbers?
Would they be denied entry?
There will be policy and regulations developed for the
effective use of the system. Choices include entry refusal to limited facility
access. Identified parents or guardians could be excepted.
How quickly will security cameras be
installed and what is the priority?
The project is scheduled to take approximately two years
to complete. The first priority is those schools that have no systems; then
those that have faulty systems; and finally those systems that are operating at
an unreliable level.

Construction
The
ten-room additions at Sundown and Mayde Creek elementary schools average
$315,000 per room. If other schools don’t cost $315,000 per room to build,
why should these additions?
The estimates for
the additions for Sundown Elementary and Mayde Creek Elementary schools
($3,515,000 each) were based on historical data from previous additions at
Nottingham County, Hutsell and Pattison. This represents a total project
cost, not only the construction.
The size of these additions is approximately 15,000 square feel, and
includes not only classroom space but also restrooms, activity and planning
areas as well as circulation space. In addition, there is a premium attached
to building a facility with small square footage, even though quantities are
less than in construction of a regular campus. The other costs associated
with the total project cost include design, testing, permits, furniture and
other classroom equipment, including technology.
Why did Katy ISD build a ninth grade center at Seven
Lakes High School as part of the original construction, but not at Morton Ranch
High School?
The timing for completion of the 9th grade centers at
Morton Ranch and Seven Lakes High Schools was based on demographic projections
when the 2002 bond package was put together. Morton Ranch High School was
scheduled to reach capacity after Seven Lakes High School (because of the
greater number of new home starts forecast for the southwest quadrant of the
district. In the meantime, builders in the north changed some of their plans,
stepping up construction and building more homes per acre than originally
projected. As a result, Morton Ranch High School grew more quickly than
projected.
The plan in 2002 was to return to the voters for a bond election in the fall of
2005 with a package that included the MRHS ninth grade center. With advance
design work and careful construction planning, a successful election last fall
would have allowed the center to open in time to accommodate the increased
enrollment indicated by the district's demographic projections at the time.
Seven Lakes was one of the last major projects to be completed in the 2002 bond
package and the 9th grade center was included because the same projections
indicated that it would be needed before the next bond package.
Here's another example of how the change in home
building patterns affected schools: Elementary #26 was originally planned for
the northwest part of the district, but when the north central area began to
grow more quickly than expected, the district responded to the need by
constructing Elementary 26 -- now Franz -- in the area.) Because it takes less
time to build an elementary school and there are generally several in a bond
authorization, it is easier to make adjustments in elementary construction based
on changing patterns.
Why can't
the district cut 10% of the cost of a new school? What would be the consequences
if brickwork, grand hallways, skylights, tile work, etc. were cut to bring the
budget down?
The only way to reduce the cost of a building by 10%
would be to reduce the square footage of the building by 10%. In order to do
that we would have to decrease the square footage of classrooms, reduce the
number of teacher planning areas, reduce the number of restrooms, reduce the
size of the gym, reduce the size of the hallways, and reduce the number of rooms
for labs and special programs. It is
always possible to build smaller or less efficient and flexible buildings, but
the standards presented for the buildings in Katy ISD meet the educational
requirements of the programs in place, as well as accommodate the
expectations of the curriculum office.
How does
the Maintenance Department determine when an item needs to be repaired versus
replaced?
Ongoing maintenance happens as required. Currently we
monitor the age of the equipment, the amount of repairs to the equipment with
in-house labor, contract costs and finally what is happening with the equipment
during preventive maintenance inspections with all items but specifically items
such as A/C equipment, boilers, hot water heaters, carpet, gym floors, intercom
systems, roofs, painting, kitchen equipment, emergency generators and water
softeners.
Would it be
feasible for the maintenance department to repair items as soon as they need
repair so that we are not spending so much in maintaining or replacing these
items?
We perform preventive maintenance functions and make
repairs as needed. We do not defer or ignore failing equipment.
How
confident is the district with applying the AGC’s and CCI index in light of
today’s current construction and material supply climate?
The Associated General Contractors (AGC) Data, in
conjunction with information from the field provided by consultants, provides
our best prognosis related to construction inflation. We live in a very volatile
market with product costs being greatly impacted currently by various factors
such as oil price increases, natural and property disasters.
On July 31, 2006, the AGC indicated a 12% projection
for the construction cost index. They also provided the comment that
construction materials will continue to rise at a rate of 8-10%.
As a result, we have updated our construction cost indexes percentages
to 12, 10, and 8.
What are we doing that is over and above the legislative requirements for
schools and how does this impact cost?
TEA provides guidelines for core spaces such as
classrooms, library, physical education (gyms only), and special education. It
is then up to the district to provide for an educational program in line with
the District’s education philosophy.
Why
does the pool continue to leak at Mayde Creek HS?
We corrected a leak in the drain and another outside
the building. The Mayde Creek High School pool is unique compared to Cinco
Ranch, Katy, Morton Ranch, Seven Lakes, and Taylor High Schools as the other
pools have automatic fills located mostly in the mechanical areas. The MCHS pool
is replenished by a garden hose directly into the pool. The MCHS pool has
considerable evaporation the other pools do not have. Also unique to MCHS is the
obscure windows on the entire roof and the west wall; outside doors that are
open all day; the pool boiler is not separated by a wall with outside
ventilation and introduces dry heat and finally continuous ventilation adding to
evaporation. There are some that say the pool continues to leak. When the drain
was repaired the leak was stopped. The outside is not leaking, we periodically
observe for damp ground outside the pool room. As of today none has been
reported. Pools with the conditions promoting evaporation will lose water.
Is
there a district wide policy or philosophy regarding keeping equal facilities
throughout?
The District strives to ensure equitable facilities
for all students across the District. Due to the physical difference between
facilities and site constraints, it is not always possible to have identical
physical facilities. Facilities personnel continually work with department
leaders to ensure that basic standards are met and that changes in the program
are implemented when appropriate.
How
much would it cost to redesign the high schools without the rotundas? Do the
rotundas really cost that much?
The main entry foyer at our most recently constructed
high schools, otherwise referred to as "the rotunda", is an extremely functional
and flexible space. Located directly off of the main entrance, it serves as a
foyer for a school of 3,000 students. It is not a stand alone space in that it
is an integral part of the circulation corridor system of the school. It has
been expanded beyond a standard corridor at this central node location to
provide added functional flexibility for the school. This space is directly
adjacent to the main cafeteria and the school communities have utilized this
space in a wide spectrum of ways. This space is often used as a support space for
activities occurring in the cafeteria. At the start of the school year, for
example, registration occurs within this space which is ideal in that it is in
such close proximity to the main office. The large group instruction space,
which is a flexible space utilized by a wide range of groups, is also located
directly adjacent to this space. The principals of these schools can attest to
the value added functional flexibility that this space provides. To reiterate,
this is not a stand alone space but an integral part of the circulation system
in the busiest area of the school. This entry foyer has been designed to create
a welcoming environment into the school which is often extremely busy with
multiple events occurring simultaneously in the immediate vicinity.
Why
do we need concrete poles for the stadium lighting upgrade?
The existing lighting support towers show many signs
of structural damage. The cost of new galvanized steel poles or pre-stressed
concrete poles is relatively the same. Steel poles require x-rays every five
years to ensure structural integrity and concrete poles are less likely to
receive a lightning strike.
Do any
of the subject renovations (i.e., brick, roofs, etc.) have any prior warranties
associated with them?
None of
the campuses recommended for an upgrade/renovation have any warranties currently
in effect.

Curriculum & Instruction
What do the distant education
“opportunities” cost? Who pays this cost? Where does this money come from?
The majority of connections that teachers can arrange for
student participation are actually free of charge. The power of video
conferencing comes when students and teachers collaborate in meaningful
partnerships and learning events. For connections requiring a fee, individual
campuses may choose to set aside in the campus/grade level budget for these
costs. In many cases the PTA/PTO also provide funds to support these
connections.
Why does a Kindergarten class need three
computers?
The philosophy of Early Childhood Education is built
on students being actively engaged in small group learning settings. While the
teacher is working with 3 or 4 students on a particular concept, the other
students are divided into additional small learning groups. The three computers are
used to learn and reinforce concepts. Students use the classroom computers
during centers, free time, literacy and creative writing lessons and as math
stations. They are also used for enrichment allowing students the opportunity to
apply already acquired skills.
In a classroom with 22 students and one teacher, where the students are divided
into four groups, a minimum of three computers is needed to meet the needs of the
learners. In fact, some districts provide Pre-K, Kindergarten, 1st
and 2nd grade classrooms with up to six computers.
Technology
What kind of storage
limitations are in place for students, teachers and administrators with respect
to servers in order to maximize space utilization?
We have what we believe are
very aggressive storage limitations for both students and employees, including
restrictions on e-mail and file storage. Even with these limitations, additional
servers are still needed to keep up with the growth.
What are
the itemized costs and standard
configuration for various servers and desktops.
Servers:
Class 1: Quad Processor 2U $25,000
Class 2: Dual Processor 2U $7,000
Class 3: Dual Processor 1U $5,000
Class 4: Single Processor 1U $2,500
The prices
listed are approximate values for the category. The price can fluctuate
depending on the unique configurations of each server.
Desktop
Lenovo M52 $922
Flat Panel 17” Monitor
Dual Core Processor 3 GHZ
80 GB Hard Drive
1 GB Ram
Laptops (Labs)
Lenovo R60 $1,200
Dual Core Processor
40 GB Hard Drive
1 GB RAM
Integrated wireless
Laptops (Admin)
Lenovo R60 $1,456
Dual Core Processor
40 GB Hard Drive
1 GB RAM
Integrated wireless
Docking Station
Keyboard
How many laptops are in a lab?
Elementary: 25
Junior High: 30
High School: 30

|