Taylor HS Pool Renovation

Project Summary
  • Bond Allocation: $2,436,923
  • Est. Construction Cost: $24,056,462 (includes Taylor HS main renovation)
  • Architect: Bay Architects
  • KISD Project Manager: Scott Walker
  • Project Completion: Summer 2013
  • Project Description:  
    Renovation of the existing pool and natatorium space at Taylor HS in regards to safety and deteriorated physical plant components.
  • Background & Justification: 
    Since the opening of this campus, no major renovations have been done to this area of the school.A review of the area by an outside engineering consultant noted the following:
    • Pool Equipment Room: Replace all original conduits, wiring electrical panels and equipment. Provide exhaust system to prevent damage to systems.
    • Natatorium’s lighting system: Replace all lighting due to the lighting being installed over the pool as this makes maintenance difficult.
    • Natatorium’s HVAC system: Replace the exhaust system and provide a pool HVAC system to ensure proper temperature, humidity and environment. Replace existing ductwork with new fiber ductwork.
    • Other items
      • The pool equipment has outlived its useful life. (Repairs & some component replacement have been done but the system continues to fail.
      • The pool area is the only facility that lacks any air conditioning/heating, resulting in numerous humidity related problems
      • The pool requires replastering, as well as a ceiling renovation including new improved lighting
      • The pool deck warrants repair followed by the application of a non-slip resistant surface
      • The locker rooms warrant renovations also due in part to humidity.  The age and humidity damage have resulted in a majority of the lockers lacking complete function.
      • Coach is unable to supervise because there is no office in this area.
      • Past flooding in the pool equipment room has led to damage in adjacent athletic areas, i.e., the gym