Project Summary

  • Budget: $104,022
  • Approved Construction Cost: $550,000
  • Engineer/Engineer: PBK Civil
  • Contractor: Beynon Sports Surfaces Inc (Purchasing Co-Op)
  • Project Completion: Late August 2011
  • Description:
    The existing track would go through a total reconstruction.  The current track has deteriorated and no longer provides an acceptable running surface.

Photo Gallery

Background/Justification:
It is recommended that the entire track be reconstructed, including demolition to the natural subsurface to provide a solid foundation. Previous funding only provided for repairs.