Construction of Playground Fences
|
Project Summary
- Budget: $367,500
- Approved Construction Cost: $367,500
- Contractor: National Fence (CSP)
- Project Completion: August 2011
Description: Provide fences to improve safety and security at Alexander ES, Franz ES, Golbow ES, Rylander ES, Schmalz ES, Sundown ES, Williams ES and Winborn ES.
Background/Justification:
- Alexander Elementary (RAE) – has a community walking and bike path on two sides of the playground. The public uses these paths throughout the day and the public use can create conflicts with school operations and student safety.
- Franz Elementary (FES) – this school has a problem with a sidewalk that is used by secondary students. The secondary students from Morton Ranch, who are dismissed an hour before the elementary, walk through the school grounds disrupting any outdoor activities at Franz Elementary.
- Golbow Elementary (GE) – this school has a flood control ditch on the south side of the playground.
- Rylander Elementary (RRE) – this school has open access on the parking lot side of the playground allowing access to students on the playground and access to the temporary buildings. The delivery area for the school is on the open side of the playground. This also allows access to the temporary buildings.
- Schmalz Elementary (SES) – is the same situation as Rylander.
- Sundown Elementary (SE) – access can be gained from the parking area as described for Rylander.
- Williams Elementary (JWE) – is the same situation as Rylander.
- Winborn Elementary (DWE) – the issue here is the temporary buildings which are very close to the road.
|
|
|
|
|
|
|
|
|
|
|
|
|
|